Your vision. Our solution.
Prefabrication and pipe installation
Pipe spools, modules and steel structures welded in our workshop in Smederevo, Serbia, and installed on site by our own teams — for data centres, energy and oil & gas projects in Germany, the Netherlands, Belgium, Denmark, Finland, Italy, Qatar and Saudi Arabia.

Capability sheet
DN25 to DN1000, carbon and stainless
What a piping package manager checks first — welding processes, execution class, pressure-equipment approval, NDT, surface protection and the shop behind them.
Every figure on this sheet is taken from our certificates, our project data and our published facility plans.
- Pipe diametersDN25 – DN1000The range across our published projects — from double-skin fuel lines to DN1000 high-pressure headers.
- MaterialsCarbon · stainlessCarbon steel (P235GH among others) and stainless steel on dedicated production lines; double-skin and double pipe spools.
- Welding processes135 · 141MAG (135) and TIG (141), per our EN 1090 welding certificate; responsible welding coordinator at Level C.
- Execution classEXC 2Steel structures up to EXC 2 to EN 1090-2:2018+A1:2024.
- Pressure equipmentPED · AD 2000PED 2014/68/EU Annex I pt. 3.1, AD 2000 HP0 and HP100R, on top of EN ISO 3834-2.
- TestingUT · RT · MT · PTNDT by personnel certified to EN ISO 9712 / ASNT; hydrostatic tests, factory acceptance tests and formal cleanliness reports.
- Surface protectionSa 3 · C2–CXAbrasive blasting up to Sa 3, airless-applied systems to ISO 12944 C2–C5 and CX, DFT to ISO 19840.
- Production facility3,800 m²Prefabrication hall, painting, blasting and packing area, warehouse with six cranes of 3–15 t, offices.
- Halls in development2 × 3,000 m²One for stainless steel works, one for heavy steel structures.
- Design & BIMLOD 100–500Revit, AutoCAD Plant 3D, Navisworks, Tekla Structures and SolidWorks.
- Certificates6Issued by TÜV Thüringen and TÜV Austria, all valid into 2028.
- Projects80+Completed since the company was founded in 2020; twelve documented here, in eight countries.
References
Packages delivered for European EPCs
Data-centre chilled water and fuel oil, double-skin generator fuel lines, high-pressure turbine piping.
Data centreFRA13 — Chilled Water Pipeline Installation
Installation of 1,500 metres of chilled-water pipeline inside a data centre in Germany, with insulation and support systems.
Power & energyASEE — GBL6A
A double-skin pipeline feeding diesel generators in Belgium: procurement, fabrication to isometrics from DN25 to DN150, installation and full QA.
DN25 – DN150
Data centreStainless Steel & Carbon Pipe Spools
Stainless and carbon double pipe spools for a large data-centre development in Belgium: engineering support, prefabrication, installation, documentation.
Power & energyASEE — GRQ5A
Design and prefabrication of a double-skin diesel supply system for generators in the Netherlands, DN25–DN150, RT on every diameter.
DN25 – DN150
Oil & gasTurboden — High-Pressure Pipeline Installation
Fabrication and installation of high-pressure pipelines from DN50 to DN1000 in Saudi Arabia, delivered in five months.
DN50 – DN1000
Data centreFRA21 — Chilled Water Pipeline Prefabrication
Prefabrication of chilled-water systems for a data centre in Germany: 17,000 diameter-inches of carbon steel spools, blasted and painted in-house.
Nine services, one contractor
From the model to the handover package
Our full range of services — from engineering and fabrication to installation and project delivery.
- 01
Design & BIM Engineering
Precise models and technical plans
- 02
Material Procurement
Sourcing certified materials and components
- 03
Prefabrication
Production of ready-to-install elements
- 04
Quality Control & Testing
Inspection and testing of each part before delivery
- 05
Painting & Coating
Protective coatings for increased material durability
- 06
Documentation & Certification
Technical records and required certifications
- 07
Transport & Logistics
Safe transport and delivery of components
- 08
On-site Installation
Professional installation and technical alignment on site
- 09
Project Management & Final Handover
Project oversight from start to final handover
Scope your piping package
Describe the package — we structure the request
Write it the way you would tell a colleague. The ML Weld assistant names the services you need from our nine, the comparable projects from our twelve, the certificates that apply and what we will need from you — and pre-fills the quotation form.
- Services from our list, each with one line on why
- One to three comparable projects we delivered
- The certificates that cover the package
- An RFQ checklist and the open questions
Prices, lead times and capacity are confirmed only by our engineers, in a quotation.
The assistant needs JavaScript. Send your request directly: Request a quote · Projects · +381 69 515 64 18
Certificates
Audited by TÜV Thüringen and TÜV Austria
Fusion welding to EN ISO 3834-2, pressure equipment to PED and AD 2000, steel structures to EXC 2, and the three management systems. Every certificate is here as a PDF.
AD 2000 · PED 2014/68/EU
Pressure equipment
- Issued by
- TÜV Thüringen e.V., Industrial Service
- Certificate no.
- 0090 153 1182
- Valid until
- 2028-04-28
EN ISO 3834-2
Comprehensive quality requirements for fusion welding
- Issued by
- TÜV Thüringen e.V., Certification Body for Construction Products
- Certificate no.
- 0090 152 1181
- Valid until
- 2028-04-28
EN 1090-1 / EN 1090-2
Welding certificate for steel structures, up to EXC 2
- Issued by
- TÜV Thüringen e.V.
- Certificate no.
- 1090-2.0015.TUWH.2022.03
- Valid until
- 2028-04-28
ISO 9001:2015
Quality management system
- Issued by
- TÜV Thüringen e.V.
- Certificate no.
- 151002211405
- Valid until
- 2028-05-17
EN ISO 14001:2015
Environmental management system
- Issued by
- TÜV Austria GmbH
- Certificate no.
- 10051250015523
- Valid until
- 2028-08-27
ISO 45001:2018
Occupational health and safety management system
- Issued by
- TÜV Austria GmbH
- Certificate no.
- 10152250015524
- Valid until
- 2028-08-27
News
From the workshop

Why a formal cleanliness report is essential for turbine and high-pressure pipelines
A hydrotest proves a pipeline holds pressure. It says nothing about what is left inside it.
Read
Factory Acceptance Test (FAT): why it is a critical step before delivery
The inspection that confirms equipment meets every technical and project requirement before it leaves the factory.
Read
Our new logo: a symbol of growth, evolution and transformation
A new visual identity for the company ML Weld Engineering has become — and the one it intends to be.
Read
ML Weld Engineering expands production capacity to meet global demand
A new 3,800 m² facility marks the next milestone in the company’s growth and capability.
Read
Request for quotation
Send us your piping package
Tell us the material, the diameter range, the quantity, the standards and where it has to be delivered. Our engineers reply with questions or a quotation.
Request a quote+381 69 515 64 18
Isometrics and drawings by e-mail: office@mlweld.rs