Power & energyBelgium · 2025/26 · €3.5M
ASEE — GBL6A
A double-skin pipeline feeding diesel generators in Belgium: procurement, fabrication to isometrics from DN25 to DN150, installation and full QA.
Project data sheetGBL6A
- Client
- ASEE
- Sector
- Power & energy
- Location
- Belgium
- Year
- 2025/26
- Contract value
- €3.5M
- Diameter range
- DN25 – DN150
- Material
- On request
- Double-skin / double pipe
- Yes
Project overview
Prefabrication and installation of a double-skin pipeline supplying fuel to diesel generators for the GBL6A project in Belgium. The scope covered material procurement, precise fabrication to isometric drawings, on-site installation and full quality assurance.
Challenges and execution
The project required exacting precision and stringent technical standards:
- Materials procured and prepared for spool diameters from DN25 to DN150
- Radiographic testing for each diameter, plus complete penetrant and visual inspection of all welds
- Hydrostatic testing of every spool to verify integrity
- Sandblasting and a certified three-layer coating system to the technical specification
- Engineering, fabrication and site teams coordinated for a seamless installation and QA/QC on site
Key deliverables
- Prefabricated double-skin pipelines fully compliant with the isometric drawings and project specifications
- Welding inspection and testing including RT, PT, VT and hydrotesting
- On-site installation with technical supervision and quality control
- Complete documentation and certification for traceability and compliance with energy-infrastructure standards
Outcome and impact
Pipelines ready for immediate service and a safe, reliable fuel supply to the diesel generators. Precision fabrication, rigorous testing and coordinated site work minimised risk and kept the project compliant with strict technical requirements.
This project demonstrates ML Weld Engineering’s technical capability and problem-solving: workshop capacity combined with expert engineering let the client execute a high-stakes project on time, to quality and with minimal risk.
More references
Comparable projects
Power & energyASEE — GRQ5A
Design and prefabrication of a double-skin diesel supply system for generators in the Netherlands, DN25–DN150, RT on every diameter.
DN25 – DN150
Energy infrastructureASEE — LPP6A
Prefabrication of a double-skin fuel pipeline for diesel generators in Finland, with engineering coordination and full quality control.
Data centreFRA13 — Chilled Water Pipeline Installation
Installation of 1,500 metres of chilled-water pipeline inside a data centre in Germany, with insulation and support systems.
Request for quotation
Send us your piping package
Tell us the material, the diameter range, the quantity, the standards and where it has to be delivered. Our engineers reply with questions or a quotation.
Request a quote+381 69 515 64 18
Isometrics and drawings by e-mail: office@mlweld.rs