Data centreItaly · 2024 · €2.7M
ITA01 — Chilled Water Pipeline Systems
Fabrication and installation of chilled-water pipelines for a live data centre in Italy: corrosion-resistant modules and in-house pressure testing.
Project data sheetITA01
- Client
- Not disclosed
- Sector
- Data centre
- Location
- Italy
- Year
- 2024
- Contract value
- €2.7M
- Duration
- 9 months
- Diameter range
- On request
- Material
- On request

Project overview
Fabrication and installation of chilled-water pipelines with high-precision welding. Corrosion-resistant modules were fully integrated with the critical cooling systems, and in-house quality control covered pressure testing and weld inspection.
Challenges and execution
A high-performance chilled-water system in a live data-centre environment required meticulous planning and strict quality oversight:
- Corrosion-resistant modules designed for durability and long-term reliability
- High-precision welding to exacting engineering tolerances
- Comprehensive pressure testing and weld inspection for operational integrity
- Installation coordinated with the critical cooling systems to minimise operational disruption
Key deliverables
- Prefabricated chilled-water pipeline modules with corrosion-resistant properties
- High-precision welding and complete pressure testing
- Integrated modules ready for connection to the cooling infrastructure
- Detailed quality documentation and inspection records
Outcome and impact
A fully operational chilled-water system with optimal efficiency and reliability. In-house quality control and precise installation minimised risk and kept the cooling uninterrupted throughout the data centre.
This project demonstrates ML Weld Engineering’s technical capability and problem-solving: workshop capacity combined with expert engineering let the client execute a high-stakes project on time, to quality and with minimal risk.
More references
Comparable projects
Data centreFRA13 — Chilled Water Pipeline Installation
Installation of 1,500 metres of chilled-water pipeline inside a data centre in Germany, with insulation and support systems.
Data centreFRA21 — Chilled Water Pipeline Prefabrication
Prefabrication of chilled-water systems for a data centre in Germany: 17,000 diameter-inches of carbon steel spools, blasted and painted in-house.
Data centreStainless Steel & Carbon Pipe Spools
Stainless and carbon double pipe spools for a large data-centre development in Belgium: engineering support, prefabrication, installation, documentation.
Request for quotation
Send us your piping package
Tell us the material, the diameter range, the quantity, the standards and where it has to be delivered. Our engineers reply with questions or a quotation.
Request a quote+381 69 515 64 18
Isometrics and drawings by e-mail: office@mlweld.rs